Guide Exmouth BMP Action Plan

Show all parts of this guide

4. Future Studies

The following future studies have been recommended as a result of the Exmouth Beach Management Plan:

Analysis is to be undertaken to determine the size and source of rock armour to be used to protect Exmouth seawall should revised trial pits indicate any risk of immediate undermining

Status

Pending trial pit results